Download PDF

Where should public electric vehicle charging stations be installed? Determining suitable locations for users, power grids, and cities

Publication date: 2026-11-25

Author:

Coulier, Bryan
Vanden Berghe, Greet ; Çalik, Hatice ; Becker, Thijs

Abstract:

The accelerating adoption of Electric Vehicles (EVs) requires a large-scale expansion of public charging infrastructure, particularly for residents without access to private parking. Planning this infrastructure is not merely a matter of locating Charging Stations (CSs) close to demand. Every charger must also be integrated into an existing Low-Voltage Grid (LVG), while its physical location is constrained by accessibility, parking availability and public space. Public charging rollout therefore lies at the intersection of urban infrastructure planning, power system planning and operations research. Nevertheless, these perspectives are commonly treated separately in the scientific literature and also in practice. Currently, cities often select candidate locations based on accessibility and available public space, after which the Distribution System Operator (DSO) assesses whether they can be connected to the electricity grid. This siloed, sequential approach can lead to many rejected locations, costly grid upgrades and missed opportunities for solutions that may not be preferred by any one stakeholder but provide a better outcome overall. Consequently, the integrated planning problem has yet to be formally defined, with no already established methodology capable of addressing it. Meanwhile, cities and DSOs are already making long-lived infrastructure decisions as charging demand continues to grow. Waiting until future demand and grid conditions are known with certainty is therefore not viable. An adaptable methodology, where its models and input data could be refined over time, is needed now. This thesis addresses this need by developing a decision-support methodology
that jointly considers charging demand, accessibility, urban siting constraints, LVG operation, network reinforcement and uncertain energy demand. Its aim is not to prescribe a universally optimal rollout plan for every city. Instead, it enables cities and DSOs to compare alternatives based on their own charging needs, public-space constraints and grid conditions. It helps to understand how each alternative balances accessibility, investment cost and grid impact. The first part of this thesis establishes the scientific foundations of integrated planning. We develop a deterministic optimization model to link the spatial coverage of charging demand to the impact on the LVG. Computational experiments show that sequential rollout strategies, where locations are selected without sufficient grid information, can result in a wide range of undesirable outcomes: a large number of infeasible connection requests, unmet demand, greater LVG congestion and overall higher installation costs. These consequences become more pronounced as EV adoption increases, demonstrating the value of coordinating CS placement with LVG integration from the outset. We then extend our methodology to jointly plan CS locations and grid reinforcements under uncertain charging demand and baseline electrical loads. Trade-offs between investment cost and grid impact are made explicit enabling stakeholders to see potential compromises they can make, such as relocating a CS or expanding the grid in a specific area. The results show that realistic urban siting restrictions can substantially increase grid stress, but that a limited number of targeted grid expansions can mitigate this. The second part of the thesis then translates these scientific foundations into practical methods that are suitable for interactive planning contexts. Exact solution methods provide solution-quality guarantees, benchmarks and insight into the problem structure. However, their computational speed limits their practical applicability in fast-paced multi-stakeholder meeting environments, where solutions need to be produced and adapted quickly. We therefore develop scalable heuristic methods to generate high-quality solutions within a predefined
runtime. The methodology is applied to a large-scale case study using urban and electrical network data from the city of Ghent, Belgium. Real-world planning required more detailed diagnostic information than was necessary during
the initial methodological development. By visualizing where grid violations occur, under which scenarios and with what severity, the methodology better supports real-world planning. This enables cities and DSOs to distinguish localized bottlenecks from systemic problems and discuss compromises between accessibility, investment cost and grid impact. No mathematical model can incorporate every aspect of charging behavior, grid operation, policy or stakeholder preference. The core project of this thesis is to therefore provide a technical translation layer through which cities and DSOs can combine their fragmented information and negotiate informed compromises without requiring every detail to be explicitly modeled. The ultimate conclusion of this thesis is that public charging rollout should be treated as an integrated urban and electrical infrastructure problem. Early coordination can avoid LVG congestion, unmet demand and poorly spent capital investment. By connecting methodological development with real-world application, this research establishes both the scientific foundations and the practical requirements for coordinated public charging and LVG planning.