ITEM METADATA RECORD
Title: TB 657: Guidelines for the preparation of "connection agreements" or "Grid Codes" for multi-terminal schemes and DC Grids
Authors: SHARIFABADI, Kamran
ADAM, Philippe
FERRAZ, Marcelo
ACHENBACH, Sven
ANDERSEN, Bjarne
BENCHAIB, Abdelkrim
DIEZ CASTRO, Ana
HIGGINS, Charlotte
HOLMBERG, Per
HUSSENNETHER, Volker
KHAN, Amir
LABRA, Patricia
MARZIN, Andrée
MILES, Tim
RENNER, Robert Heinrich
SMITH, Christopher
VAN HERTEM, Dirk
Issue Date: 2016
Publisher: CIGRÉ
Abstract: In the light of recent advancement of HVDC technology and the prospect of DC grid projects a need to address the required guide lines to develop the DC grid codes has arisen. Grid Codes or network codes are a set of rules and guidelines that govern a power system environment with multiple stakeholders, which describe e.g. the technical requirements that the equipment must fulfil in order to be integrated in the system and the rules and guidelines for interactions between the systems and stakeholders under steady state or abnormal operation conditions. This brochure provides recommendations on the models of interactions between the stakeholders and activities from planning to operation including technical aspects of planning, building and operation of a DC grid. Based on these recommendations a specific (set of) grid code(s) can be developed for the DC grid. The focus of this document is on the MTDC grids, and not on the HVAC networks which are connected to these DC grids. The objective of this brochure is to support the concerned stakeholders i.e. system planners, system operators (SO) and system users, to develop their own particular DC grid code.
Publication status: published
KU Leuven publication type: ER
Appears in Collections:ESAT - ELECTA, Electrical Energy Computer Architectures

Files in This Item:

There are no files associated with this item.

Request a copy

 




All items in Lirias are protected by copyright, with all rights reserved.