ITEM METADATA RECORD
Title: Cost recovery in congested electricity networks
Authors: Pepermans, Guido ×
Willems, Bert #
Issue Date: 2010
Publisher: Vieweg und Teubner Verlag
Series Title: Zeitschrift für Energiewirtschaft vol:34 issue:3 pages:195-208
Abstract: Large scale investments in European electricity networks are foreseen in the next decade. Pricing the network at marginal cost will not be sufficient to pay for those investments as the network is a natural monopoly. This paper derives numerically the socially optimal transmission prices for cost recovery, taking into account that electricity networks are often congested, while allowing for market power in generation. The model is illustrated with a Stackelberg game for the Belgian electricity market.
Hohe Investitionen in Europäische Stromnetze sind in der nächsten Dekade zu erwarten. Eine Preisfestlegung für das Netz zu Grenzkosten wird für die Finanzierung dieser In-vestitionen nicht ausreichen, da das Netz ein natürliches Monopol ist. Dieser Artikel leitet numerisch die gesellschaftlich optimalen kostendeckenden Übertragungspreise unter Berücksichtigung einer häufigen Überlastung der Stromnetze unter gleichzeitiger Zulassung der Marktmacht bei der Erzeugung ab. Das Modell wird mittels eines Stackelberg-Spiels für den Belgischen Strommarkt veranschaulicht.
ISSN: 0343-5377
VABB publication type: VABB-1
Publication status: published
KU Leuven publication type: AT
Appears in Collections:Research Center of Energy, Transport and Environment, Leuven
Faculty of Economics and Business (FEB) - miscellaneous
Research Centre for Economics and Corporate Sustainability, Campus Brussels
× corresponding author
# (joint) last author

Files in This Item:
File Description Status SizeFormat
GP & BW.pdf Published 415KbAdobe PDFView/Open Request a copy

These files are only available to some KU Leuven Association staff members

 




All items in Lirias are protected by copyright, with all rights reserved.