ITEM METADATA RECORD
Title: Impact of market designs on generation adequacy
Authors: Meeus, Leonardo
Buijs, Patrik
Coulondre, Jean-Marie
Ott, Andrew
DiCaprio, Albert #
Issue Date: Oct-2009
Publisher: Cigré
Host Document: Cigré Symposium on Operation and Development of Power Systems in the New Context
Conference: Cigré Symposium on Operation and Development of Power Systems in the New Context location:Guilin, China date:28-30 October 2009
Article number: 144
Abstract: This paper provides a comparative analysis of the impact of Market designs on generation adequacy. The paper introduces the general issues associated with generation adequacy;
discusses generation adequacy in terms of electricity markets; and presents two specific market designs – France and PJM – and their respective practices and experiences with generation adequacy.

The basic information is derived from an international survey distributed by the Task Force on Impacts on Infrastructure Investment resulting from Electricity Market Designs (TF C5-7.1) of CIGRE’s Working Group C5-7 on Market Design.
ISBN: 978-2-85873-081-0
Publication status: published
KU Leuven publication type: IC
Appears in Collections:ESAT - ELECTA, Electrical Energy Computer Architectures
# (joint) last author

Files in This Item:
File Description Status SizeFormat
meeus_et_al_2009_cigre_symp_guilin.pdfarticle_cigre_meeus_et_al Published 245KbAdobe PDFView/Open

 


All items in Lirias are protected by copyright, with all rights reserved.