ITEM METADATA RECORD
Title: On the paper 'Resource constraint project scheduling: notation, classification, models and methods' by Brucker et al
Authors: Herroelen, Willy
Demeulemeester, Erik
De Reyck, B
Issue Date: 1999
Publisher: K.U.Leuven - Departement toegepaste economische wetenschappen
Series Title: DTEW Research Report 9904 pages:1-14
Abstract: The great variety of project scheduling problems studied in the ever growing literature motivated the recent development of classification schemes. In a recent paper (EJOR, 112 (1999) 3-41), Brucker et al. make the claim that, so far, no classification scheme exists which is compatible with what is commonly accepted in machine scheduling and introduce a new classification. In this note, we critically review major shortcomings of the suggested scheme which play heavy limitations on its potential use.
Publication status: published
KU Leuven publication type: IR
Appears in Collections:Research Center for Operations Management, Leuven

Files in This Item:
File Status SizeFormat
OR_9904.pdf Published 238KbAdobe PDFView/Open

 


All items in Lirias are protected by copyright, with all rights reserved.