Production and Inventory Management Third Quarter 1988
Author:
Keywords:
Bottlenecks, Case studies, Companies, Inventory control, Just in time, Management, Material requirements planning, Problems, Production scheduling, Requirements, Simulation, Software, Studies, Theory, Business & Management
Abstract:
The key success factor for material requirements planning (MRP), synchronous manufacturing (SYN), and just-in-time (JIT) is found in the management of capacity. Two case studies of bottleneck management are presented, which are highly simplified situation sketches of real-life problems. Three companies located in Belgium were closely followed during the introduction of JIT. All simulations are based on the XCELL Software. The first case study involves reducing the time bucket in an MRP system. The simulations demonstrate that the success of JIT-kanban depends on how well a company is able to manage capacity. The 2nd case study explores kanban and changes in the master production schedule. This case illustrates that a JIT-kanban system is very sensitive to changes in the production plan. The kanban planner has to react to problems after they arise, whereas SYN would have discovered the bottleneck problem in advance so that the planner could anticipate