Title: A note on the paper "Resource-constrained project scheduling: Notation, classification, models and methods" by Brucker et al
Authors: Herroelen, Willy ×
Demeulemeester, Erik
De Reyck, B #
Issue Date: Feb-2001
Publisher: Elsevier science bv
Series Title: European journal of operational research vol:128 issue:3 pages:679-688
Abstract: The great variety of project scheduling problems studied in the ever growing literature motivated the recent development of classification schemes. In a recent paper (European Journal of Operational Research 112 (1999) 3-41), Brucker et al. make the claim that, so far, no classification scheme exists which is compatible with what is commonly accepted in machine scheduling and introduce a new classification. In this note, we critically review major shortcomings of the suggested scheme which place heavy limitations on its potential use. (C) 2001 Elsevier Science B.V. All rights reserved.
URI: 
ISSN: 0377-2217
Publication status: published
KU Leuven publication type: IT
Appears in Collections:Research Center for Operations Management, Leuven
× corresponding author
# (joint) last author

Files in This Item:
File Status SizeFormat
Anoteonthepaper.pdf Published 111KbAdobe PDFView/Open Request a copy

These files are only available to some KU Leuven Association staff members

 




All items in Lirias are protected by copyright, with all rights reserved.

© Web of science