ITEM METADATA RECORD
Title: The multi-mode resource-constrained project scheduling problem with generalized precedence relations
Authors: De Reyck, B ×
Herroelen, Willy #
Issue Date: Dec-1999
Publisher: Elsevier science bv
Series Title: European journal of operational research vol:119 issue:2 pages:538-556
Abstract: In this paper, we tackle the challenging problem of scheduling activities to minimize the project: duration, in which the activities (a) are subject to generalized precedence relations, (b) require units of multiple renewable, non-renewable and doubly constrained resources for which a limited availability is imposed, and (c) can be performed in one of several different ways, reflected in multiple activity scenarios or modes. These multiple modes give rise to several kinds of tradeoffs (time/resource, time/cost and resource/resource trade-offs) which allow for a more efficient allocation and use of resources. We present a local search-based solution methodology which is able to handle many real-life project scheduling characteristics such as time-varying resource requirements and availabilities, activity ready times, due dates and deadlines, activity overlaps, activity start time constraints and other types of temporal constraints. (C) 1999 Elsevier Science B.V. All rights reserved.
URI: 
ISSN: 0377-2217
Publication status: published
KU Leuven publication type: IT
Appears in Collections:Research Center for Operations Management, Leuven
× corresponding author
# (joint) last author

Files in This Item:

There are no files associated with this item.

Request a copy

 




All items in Lirias are protected by copyright, with all rights reserved.

© Web of science